Grimshaw Rebuilds Fire-Damaged Chinatown Community Center in New York
Grimshaw has begun rebuilding 70 Mulberry Street in Chinatown, returning five organizations displaced by a 2020 fire to an 85,720-square-foot community center with expanded facilities.
- Section
- Renovation & Retrofit
- Author
- By Marcus Bennett
- Filed
- Length
- 2 min read
Key takeaways
- A January 2020 fire destroyed the upper three floors of 70 Mulberry Street and displaced five tenants
- The 85,720-square-foot reconstruction returns approximately 51,000 square feet to the five former tenants
- Grimshaw's design adds 16,500 square feet of new community facilities
- Three new elevators and operable windows improve accessibility and ventilation
- A permanent artwork by Jennifer Wen Ma was commissioned via the Percent for Art program
A January 2020 fire destroyed the upper three floors of 70 Mulberry Street. Grimshaw has now begun the reconstruction of the Chinatown building, which will return five displaced organizations to the site within an 85,720-square-foot scheme led by the New York City Department of Design and Construction (DDC).
The building opened in the late nineteenth century as Public School 23 and later housed several of the neighborhood's cultural and nonprofit organizations. The fire forced out five tenants: the Chinese-American Planning Council, Chen Dance Center, Museum of Chinese in America, United East Athletics Association, and Chinatown Manpower Project.
What does the reconstruction deliver?
The project returns approximately 51,000 square feet to those five former tenants. Grimshaw's design adds 16,500 square feet of additional community facilities alongside the restored tenant spaces. The design team developed the scheme through a community engagement process involving former tenants and neighborhood representatives, whose feedback informed the final layout.
The historic street-facing facades will be retained, maintaining the building's presence along Mulberry Street. Behind them, the reconstruction introduces:
- A double-height multipurpose room for recreation and community events
- Meeting rooms and offices for the resident organizations
- Flexible spaces available for reservation and shared use by the wider neighborhood
Which technical upgrades are included?
Accessibility and environmental performance drive the technical scope. Three new elevators will provide access throughout the building. Operable windows will allow natural ventilation. Landscaped terraces and street trees are intended to mitigate the urban heat island effect, complementing broader environmental improvements to the performance of the reconstructed structure.
A permanent public artwork by Jennifer Wen Ma, commissioned through the NYC Department of Cultural Affairs' Percent for Art program, will be incorporated into the building.
What else is moving in the sector?
Two cultural projects announced opening dates. The New Mexico Literacy Institute, designed by Multistudio with Design Plus Architects, is scheduled to open in December 2026. The KAI Water Culture House in Copenhagen, designed by Kengo Kuma & Associates, Cornelius Vöge Atelier for Architecture, and Vilhelm Lauritzen Architects, is set to open on December 5.
Mecanoo has released new images of its ongoing renovation of Museum Boijmans Van Beuningen in Rotterdam. That project includes the restoration and reorganization of the existing museum, a new building, and improvements to the surrounding Museum Garden.
For the five Chinatown organizations, the reconstruction restores a shared address and expands the cultural, recreational, and community facilities available in the neighborhood beyond what the former school building offered before the fire.
Source: ArchDaily
More from Marcus Bennett
Show full bio
Correspondent covering money, funding and market shifts around construction industry, architecture, interior design at Built Current.
328 articles


