
DMCI Homes Aims for December 2027 Delivery of Makati's Fortis Residences
DMCI Homes targets December 2027 completion for its 576-unit Fortis Residences in Makati, as Colliers reports less than 1% of Metro Manila's unsold condo stock sits in the city.
- Section
- Construction
- Author
- By Grace Kim
- Filed
- Length
- 2 min read
Key takeaways
- Fortis Residences is a 37-story, 576-unit condo targeting completion in December 2027.
- Makati holds less than 1% of Metro Manila's unsold ready-for-occupancy condominium inventory, per Colliers' Joey Bondoc.
- Makati CBD office vacancy is 9% versus the Metro Manila average of 19.5%.
- The project includes a 25-meter rooftop pool and sits near MRT-3's Magallanes station.
DMCI Homes says it will deliver Fortis Residences, its 37-story condominium in Makati City, by December 2027 — and its president argues that holding the schedule is the key to quality.
"The projects that are being delayed, that's where the quality problems occur," DMCI Homes President Alfredo R. Austria said at the launch of the project's rooftop amenities on Nov. 11. "We like to have a very timely [and] very good schedule of our projects, so that in case you see some things within the project site that are not up to quality standards that we have set, there is time to correct them."
Austria said maintaining construction schedules gives the developer enough room to identify and fix deficiencies without cutting corners on standards.
What does the project look like?
Fortis Residences is an upscale residential development comprising 576 units in one-, two-, and three-bedroom configurations. Amenities include a 25-meter rooftop swimming pool and landscaped areas. The tower sits within walking distance of the Magallanes station of Metro Rail Transit Line 3.
How does DMCI keep the timeline?
DMCI Homes, the property arm of listed DMCI Holdings, Inc., runs an integrated design-and-build model covering design, engineering, procurement, and construction. Fortis Residences Construction Area Manager Jet Tugado said that structure lets teams coordinate and protect the schedule.
"Being a design and build company, construction, from design, engineering, purchasing, up to the actual construction, this enables us to work together to produce an output that, which will not delay the project, [rather] finish it early," he said.
Tugado also pointed to the company's quality management department, which oversees compliance with internal construction standards across projects.
Why Makati?
The market case for the location comes from Colliers Philippines. Director for Research Joey Roi Bondoc said Makati accounted for less than 1% of Metro Manila's total unsold ready-for-occupancy condominium inventory — a measure of Makati's share of unsold completed units across the metro, not the share of unsold units within Makati itself.
Office conditions are just as tight. Bondoc said the Makati central business district posted a 9% office vacancy rate, compared with a Metro Manila average of 19.5%.
"If you are an outsourcing company [or a] multinational corporation, it would be very difficult for you to look for an office building in Makati CBD that has two [to] three floors [of space]," he said during the event.
What does this change for buyers? Limited unsold completed condominium stock and scarce office space in the CBD, Bondoc said, could open opportunities for residential developments in the surrounding areas — the corridor where DMCI is now building.
Source: bworldonline.com
More from Grace Kim
Show full bio
Staff writer covering money, funding and market shifts around construction industry, architecture, interior design at Built Current.
345 articles


