Graham bags £45m Stratford student scheme
Graham bags £45m Stratford student schemeAI-generated

Construction

Graham lands £45m Stratford student scheme for Gamuda Land UK

Graham has secured a £45m contract from Gamuda Land UK for a 321-bed student scheme at Marshgate Lane in Stratford, 100m from Pudding Mill Lane DLR.

Author
By Elena Vasquez
Filed
Length
2 min read

Key takeaways

  • Graham won a £45m construction contract for a student accommodation scheme in Stratford, east London.
  • The Marshgate Lane development will deliver 321 beds in cluster flats and self-contained studios.
  • The site sits 100m from Pudding Mill Lane DLR station, between Stratford High Street and Queen Elizabeth Olympic Park.
  • Ground level will include 294 sq m of commercial space for artists' studios and workspace.
  • The scheme includes a new road plus improved pedestrian and cycle access from the north of the site.

Graham has won a £45 million contract to build a 321-bed student accommodation scheme for Gamuda Land UK at Marshgate Lane in Stratford, east London.

The project sits between Stratford High Street and Queen Elizabeth Olympic Park, roughly 100 metres from Pudding Mill Lane DLR station. That's a two-minute walk for students heading to class or the park.

The appointment moves the development into its construction phase. It also signals Gamuda's broader push to grow its London development portfolio.

What will the scheme include?

The 321 beds break down into two formats: cluster flats and self-contained studios. Shared kitchen, dining and social spaces will serve both, alongside a gym and games rooms.

An elevated communal space will run the length of the landscaped site. Students will be able to study and socialise there, overlooking the surrounding waterways.

At ground level, 294 sq m of commercial space is set aside for artists' studios and workspace — roughly the footprint of four tennis courts given over to creative use.

Graham's remit goes beyond the buildings. The contractor will also deliver a new road and improved pedestrian and cycle access from the northern side of the site, tying the scheme into its surroundings.

Why does the deal matter?

For Gamuda Land UK, the contract marks a shift from planning to delivery. Niall Farmer, head of Gamuda Land UK, said: "The appointment of Graham marks an important milestone as we move into the delivery phase of Marshgate Lane, reflecting our confidence in Stratford as one of London's most dynamic and well-connected growth locations."

The quote does two things at once. It confirms the project's timeline, and it frames Stratford as a market where the Malaysian-backed developer intends to keep building — a signal worth watching as Gamuda expands its London pipeline.

The next visible step is site work at Marshgate Lane, with Graham now responsible for turning a £45 million appointment into 321 student beds on the edge of the Olympic Park.

Source: Construction Enquirer

student-accommodation stratford gamuda-land london graham-construction

Share this article:

More from Elena Vasquez

Elena Vasquez

Show full bio

Senior reporter covering money, funding and market shifts around construction industry, architecture, interior design at Built Current.

126 articles

More projects

« Previous articleNext article »