
BIG plans 13,000 sqm timber district at Thun’s city entrance
Bjarke Ingels Group has won a competition for four timber buildings in Thun’s Siegenthalergut district, pairing two hotels with homes, gardens, solar panels and alpine terraces.
- Section
- Architecture
- Author
- By Amara Osei
- Filed
- Length
- 3 min read
Key takeaways
- BIG’s winning proposal covers 13,000 square metres across four timber buildings in Thun’s Siegenthalergut district.
- The scheme pairs a three-star and four-star hotel with approximately 6,500 square metres of residential space.
- The hotel program occupies 6,000 square metres, while commercial activities account for 400 square metres.
- Approximately 1,800 square metres of photovoltaic panels are planned, and the development targets SNBS Gold certification.
- Construction of the district’s first buildings is possible from 2028.
By Amara Osei
Bjarke Ingels Group (BIG) has unveiled plans for a 13,000-square-metre timber district comprising four buildings in Thun, Switzerland’s emerging Siegenthalergut neighborhood. Designboom reports that the development will combine two hotels with housing and commercial space at Thun’s western entrance.
The stacked timber volumes project above the street. Deep window grids and large terraces cut into the stepped facades, with the Bernese Alps forming the backdrop.
What will stand at Thun’s western edge?
The proposal is titled “Nachwachsende Stadt” (“Growing City”). BIG’s proposal won a competition organized by client Frutiger AG and the city of Thun, and it occupies one of the first two plots planned for Siegenthalergut. BIG developed the scheme with August + Margrith Künzel Landschaftsarchitekten AG; wh-p Ingenieure and Stokar + Partner AG serve as engineering collaborators.
The plot sits opposite a sports center and the future headquarters of the Swiss Football Association, giving the BIG-designed buildings a prominent position along Thun’s western entrance.
How will two hotels share one building?
At the southwest corner, BIG brings a three-star and four-star hotel together under one roof. Shared amenity spaces cut diagonally through the timber structure, creating setbacks and outdoor terraces that overlook the neighboring sports facilities and the Bernese Alps. A restaurant and terrace at the top will give guests a broader view of the surrounding landscape.
At street level, a cantilevered corner marks the main hotel entrance and opens onto a drop-off plaza beneath the projecting upper floors. Commercial spaces line the adjacent boulevard, bringing activity to the ground floor.
Across the facade, large square windows sit within deeply framed timber modules. Recessed portions reveal warmer, sheltered spaces behind the exterior grid. The massing changes as the viewpoint shifts.
How do the residences meet the courtyard?
To the east, BIG places the remaining timber buildings. Flexible layouts and projecting bays shape the residences, while balconies extend beyond the facades and recessed loggias create sheltered outdoor rooms. In BIG’s design, the shifting arrangement gives each elevation a different rhythm and carries daylight deeper into the apartments.
The residences face an internal courtyard where winding paths move through gardens and planted gathering spaces. Designboom’s renderings show grassy areas beneath the timber facades and balconies overlooking the shared landscape. Small plazas and seating areas spread through the development, connecting the homes to the surrounding neighborhood. The courtyard, in other words, has a job.
BIG’s project breakdown gives:
- Approximately 6,500 square metres to residential uses.
- 6,000 square metres to hotel space.
- 400 square metres to commercial activities.
What does the timber strategy include?
Timber extends across all four buildings. BIG says its use establishes a consistent material language and helps reduce the development’s embodied carbon footprint. The firm has designed the timber elements for future disassembly and reuse, allowing components to be recovered as the buildings change.
Deep balconies and roof overhangs provide natural shade in summer and shelter during colder months. Green roofs and rainwater retention systems will help manage water across the site.
Approximately 1,800 square metres of photovoltaic panels are planned to generate renewable energy. The development targets Switzerland’s SNBS Gold sustainability certification.
When can construction begin?
After selection, the winning proposal will move through further design and approval stages. Construction of the district’s first buildings is possible from 2028.
BIG opened its Zurich office in 2023. The Thun scheme adds another timber-focused project to the firm’s Swiss portfolio, alongside the planned Dock A terminal at Zurich Airport. Designboom credits the visualizations to IMIGO and BIG.
For Thun, the next milestone is administrative rather than visual: further design and approvals must clear before construction can start in 2028. BIG’s promise of recoverable timber faces a longer test when the buildings change.
Original: google.com
More from Amara Osei
Show full bio
Market editor covering companies, deals and strategy in construction industry, architecture, interior design at Built Current.
398 articles

