Stalled Yorkshire Post scheme switches student towers for offices
Stalled Yorkshire Post scheme switches student towers for officesAI-generated

Urbanism & Planning

Prescient Capital Scraps Student Towers for Offices on Leeds Yorkshire Post Site

Prescient Capital replaces consented 42-storey student towers with two office blocks of 15 and 17 storeys offering nearly 49,000 sq m on the former Yorkshire Post site in Leeds.

Author
By Marcus Bennett
Filed
Length
1 min read

Key takeaways

  • New plan replaces around 1,700 student rooms with 15 and 17-storey office blocks totalling nearly 49,000 sq m
  • 2023 consent allowed up to 42-storey buildings but the £400M scheme stalled; site largely vacant since demolition in 2014
  • DLA Architecture designs the BREEAM Outstanding-targeting scheme, with Waterman on M&E and Roscoe as structural engineer

Prescient Capital is attempting to reboot the stalled redevelopment of the former Yorkshire Post site in Leeds by replacing consented student towers with two major office buildings.

The latest plan switches the northern plots from around 1,700 student rooms to 15 and 17-storey office blocks providing nearly 49,000 sq m of workspace. The rethink follows further market testing and viability work aimed at unlocking the next phase of the prominent city centre site, which has remained largely vacant since the former newspaper headquarters was demolished in 2014.

Planning permission for redevelopment of the former Yorkshire Post site was first granted in 2015. The first phase later delivered The Headline residential building, a stepped block of flats rising from 13 to 18 floors.

A further consent secured in 2023 allowed around 1,700 student beds and 348 homes in buildings reaching up to 42 storeys, but the scheme failed to progress. The previous consented scheme was valued at £400M.

The latest move significantly cuts the height of the northern blocks while switching their use from student accommodation to offices in an attempt to get the long-running regeneration scheme moving again.

DLA Architecture is designing the new scheme, with Waterman providing M&E and BREEAM services and Roscoe acting as structural and civil engineer.

The buildings are targeting BREEAM Outstanding. The scheme also includes new public realm and new routes through the site, alongside a minimum 10% biodiversity net gain.

Prescient will work with Leeds City Council over how the surviving Yorkshire Post clock tower can be reimagined within the development.

The latest application covers only the northern section of the wider site. A separate developer is expected to bring forward fresh proposals for the southern riverside plots in due course.

Source: Construction Enquirer

leeds office-development prescient-capital breeam planning

Share this article:

More from Marcus Bennett

Marcus Bennett

Show full bio

Correspondent covering business strategy at Built Current.

62 articles

More projects

« Previous articleNext article »