Amey Wins Twin Northern Powerhouse Rail Roles Across Yorkshire
Amey has secured two Northern Powerhouse Rail deals, taking charge of integrating six Yorkshire rail projects into one network for Network Rail.
- Section
- Urbanism & Planning
- Author
- By Grace Kim
- Filed
- Length
- 2 min read
Key takeaways
- Amey has won two Northern Powerhouse Rail contracts from Network Rail
- The system integration role covers six projects, including Bradford-Leeds, Leeds station, Leeds-York and Leeds-Sheffield
- Both deals came through Network Rail's Development and Design Partnership Framework; contract values were not disclosed
- The latest award is Amey's third major win under the framework
- Amey's report will support the case for NPR's first phase
Amey has landed two Northern Powerhouse Rail contracts from Network Rail, putting the consultant in charge of making six projects across Yorkshire work together as one railway.
Neither deal has a disclosed value. Both were awarded through Network Rail's Development and Design Partnership Framework, and the latest award marks Amey's third major win under that framework.
The first role is system integration. It spans projects covering Bradford to Leeds, Leeds station, Leeds to York and Leeds to Sheffield. Amey will pull together the options, testing journey times and network performance against cost, buildability and maintenance needs.
The consultant's report will also map out benefits, land and consent requirements. That work will support the business case for NPR's first phase.
The second role is narrower but just as consequential. On the Leeds to Sheffield corridor, Amey will develop engineering proposals to boost capacity while keeping disruption down for passengers and freight. It follows a separate win to develop upgrades on that route, paving the way for more trains and faster journeys.
Amey will also examine station stops, particularly at Sheffield, to establish how time spent at platforms affects the wider network.
Colin Wood, managing director at Amey, said: "At Amey, we believe major rail programmes succeed when individual projects are designed and delivered as part of a wider, integrated system."
What does this change for Northern Powerhouse Rail?
For now, it changes the paperwork rather than the tracks. The system integration role means one consultant now holds the threads connecting Bradford, Leeds, York and Sheffield schemes, and the resulting report will shape what the government and Network Rail can credibly promise for NPR's first phase.
For Yorkshire commuters and freight operators, the practical stakes are capacity and journey times on the Leeds to Sheffield corridor. Amey's engineering proposals will determine how much extra train service the route can carry without years of disruptive construction.
What it signals most clearly is momentum. Amey's third framework award strengthens its rail consulting workload just as the next phase of NPR takes shape, and the framework route suggests more development contracts will follow through the same channel.
Source: Construction Enquirer
More from Grace Kim
Show full bio
Staff writer covering money, funding and market shifts around construction industry, architecture, interior design at Built Current.
115 articles

