Tunnelling Complete on £150m Hinkley Point C Fish Return Pipeline
A five-month drive has completed the 620m, 1.8m-diameter seabed tunnel that will return fish to the Bristol Channel, part of £700m in marine protection measures at Hinkley Point C.
Topic
Topic
A five-month drive has completed the 620m, 1.8m-diameter seabed tunnel that will return fish to the Bristol Channel, part of £700m in marine protection measures at Hinkley Point C.