Lower Thames Crossing Fleet to Reach 150 Zero-Emission Machines
More than 30 zero-emission machines now work on the £10bn Lower Thames Crossing, with the diesel-free fleet set to reach 150 machines at peak construction in 2028.
Topic
Topic
More than 30 zero-emission machines now work on the £10bn Lower Thames Crossing, with the diesel-free fleet set to reach 150 machines at peak construction in 2028.